www.robowars.org

RoboWars Australia Forum Index -> Builders Reports

QRSC Arena - Queensland
Goto page Previous  1, 2, 3, 4, 5  Next

Post new topic   Reply to topic
  Author    Thread
Daniel
Experienced Roboteer


Joined: 30 Aug 2005
Posts: 2729
Location: Gold Coast


 Reply with quote  

I keep asking Andrew if the plate for the crash panels and the frame work for the corners and door have been ordered yet and he keeps saying "he'll do it tomorrow". I hope its ordered today otherwise we won't have it for the weekend.
No one else us put up their hands for hole drilling duties yet.

*edit* Steel has been ordered and we'd get at least the door and corner peices before te weekend. It has been decided that the corner L-bracket will be welded to one wall panel and then then bolted to the other. That we we won't have to worry about bolts interfering. This is also handy if the door is in the corner.

Post Thu Feb 05, 2009 12:28 pm 
 View user's profile Send private message Send e-mail
Daniel
Experienced Roboteer


Joined: 30 Aug 2005
Posts: 2729
Location: Gold Coast


 Reply with quote  

Post Sat Feb 07, 2009 8:17 pm 
 View user's profile Send private message Send e-mail
Daniel
Experienced Roboteer


Joined: 30 Aug 2005
Posts: 2729
Location: Gold Coast


 Reply with quote  

Big post time with a lot of photos.

The frame with crash panels finished.


5m x 5m. I can fit two cars in there.


The pole in the center is our house, not the arena


Hellbringer trying to make the wall move. We will need the tie strapes, but only 2.


How the crash panels are welded on


8mm gap between the crash panel and the frame. The 6mm polycarb will fit in the gap. This is so the bottom edge of the polycar will be protected from veterical spinners.


Bottom corner of the door with the crash panel over lapping the frame.


The hinge side of the door. It opens and closes well.


The top corner of the door. The gap between the door and the frame is for the bolt heads to fit in.


The outside of the door


The door frame with the door open.


We are about 50% through the construction. Still need help. Next weekend with will be working on the roof trusses.

Post Sun Feb 15, 2009 6:24 pm 
 View user's profile Send private message Send e-mail
Rotwang
Experienced Roboteer


Joined: 15 Jun 2004
Posts: 1589
Location: Vic


 Reply with quote  

I am still a little concerned about the less than flat concrete at the venue? You’re sure it will bolt together OK on the convex surface.
_________________
Satisfaction is proportional to effort and results.

Post Sun Feb 15, 2009 6:48 pm 
 View user's profile Send private message
Daniel
Experienced Roboteer


Joined: 30 Aug 2005
Posts: 2729
Location: Gold Coast


 Reply with quote  

Our garage floor is more convex then the Suncorp Piazza. Lets just say we are getting lots of practice. Very Happy

Post Sun Feb 15, 2009 6:52 pm 
 View user's profile Send private message Send e-mail
Damien (not Damian)



Joined: 15 Sep 2005
Posts: 327
Location: The other side of The Wall...Melbourne


 Reply with quote  

Oh, I was thinking that pole was an obstacle or something Smile I actually think it'd be interesting to have that there, more stuff to ram robots into Razz
_________________
It seemed like a good idea on paper...

Post Sun Feb 15, 2009 6:54 pm 
 View user's profile Send private message
Knightrous
Site Admin


Joined: 15 Jun 2004
Posts: 8511
Location: NSW


 Reply with quote  

Looks good guys, keep up the good work.
_________________
https://www.halfdonethings.com/

Post Sun Feb 15, 2009 7:16 pm 
 View user's profile Send private message
Philip
Experienced Roboteer


Joined: 18 Jun 2004
Posts: 3842
Location: Queensland near Brisbane


 Reply with quote  

quote:
Originally posted by Daniel:
Still need help. Next weekend with will be working on the roof trusses.
What exactly do you need done with the roof trusses? I can not weld so I don't know if I am able to help.
_________________
So even the rain that falls isn't actually going to fill our dams and our river systems

Post Sun Feb 15, 2009 7:56 pm 
 View user's profile Send private message
Daniel
Experienced Roboteer


Joined: 30 Aug 2005
Posts: 2729
Location: Gold Coast


 Reply with quote  

We are thinking of running those big sleepers you donated from the middle of one side to the other as a main beam and then running lengths of 2x4 across from the other 2 walls to meet it. I think we'd need 5 of these on each side. Roof panels will then screw up from the underside into the 2x4. We have already started fighting about weather we need to set the arena up to do this. Andrew says no and I say yes. But we don't own any wood cutting tools and have never built anything like that before so we are slightly unsure what we are doing. That has been the case with the entire arena so far and its turning out pretty well.

Post Sun Feb 15, 2009 8:07 pm 
 View user's profile Send private message Send e-mail
Philip
Experienced Roboteer


Joined: 18 Jun 2004
Posts: 3842
Location: Queensland near Brisbane


 Reply with quote  

You might consider joining the sleepers end to end and then bolting plates on either side to join them. Roofing batons might be a better choice to span 2.5 m unsupported as opposed to 2*4s.
_________________
So even the rain that falls isn't actually going to fill our dams and our river systems

Post Sun Feb 15, 2009 8:58 pm 
 View user's profile Send private message
Daniel
Experienced Roboteer


Joined: 30 Aug 2005
Posts: 2729
Location: Gold Coast


 Reply with quote  

See, we have no idea. Very Happy We need a shopping list for this week. Or come and tell us what to buy on saturday morning, we go shopping saturday afternoon and then get Marto to build it on sunday.

Post Sun Feb 15, 2009 9:06 pm 
 View user's profile Send private message Send e-mail
Knightrous
Site Admin


Joined: 15 Jun 2004
Posts: 8511
Location: NSW


 Reply with quote  

What's the design for the roof? Sleepers for roof supports sounds rather heavy to me Confused
_________________
https://www.halfdonethings.com/

Post Sun Feb 15, 2009 9:07 pm 
 View user's profile Send private message
Daniel
Experienced Roboteer


Joined: 30 Aug 2005
Posts: 2729
Location: Gold Coast


 Reply with quote  

Yeah, part of the shopping list is two hard hats for the dumb guys who get the job of setting the roof up at events.

Post Sun Feb 15, 2009 9:09 pm 
 View user's profile Send private message Send e-mail
Damien (not Damian)



Joined: 15 Sep 2005
Posts: 327
Location: The other side of The Wall...Melbourne


 Reply with quote  

'Sleeper' gets a new meaning afterwards Smile
_________________
It seemed like a good idea on paper...

Post Sun Feb 15, 2009 9:11 pm 
 View user's profile Send private message
Philip
Experienced Roboteer


Joined: 18 Jun 2004
Posts: 3842
Location: Queensland near Brisbane


 Reply with quote  

You Might also like to look at C and Z purlins http://www.stratco.com.au/products/steel_framing/types/c_z_purlins/c_z_purlins.asp My shed uses (from memory) 200 mm C purlins that span 6 m with 60 mm roof battens that span 3 m. You might be able to have a quick look at a flat roof carport and see if you want to copy that.
_________________
So even the rain that falls isn't actually going to fill our dams and our river systems

Post Sun Feb 15, 2009 9:23 pm 
 View user's profile Send private message
  Display posts from previous:      

Forum Jump:
Jump to:  

Post new topic   Reply to topic
Page 3 of 5

Goto page Previous  1, 2, 3, 4, 5  Next

Forum Rules:
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum

 

Last Thread | Next Thread  >
Powered by phpBB: © 2001 phpBB Group
millenniumFalcon Template By Vereor.